BES — Building Energy Solutions Building Energy Solutions Start an assessment

Funding

We know which programmes actually pay.

We are an authorised consultant on the programmes below. Eligibility differs per programme and terms change annually — we verify before you commit engineering spend.

Region
FunderProgrammeBest fitWhat it covers
FortisBCCommercial Custom ProgramCommercial & industrialCustom incentives for gas-saving retrofits, backed by a BES energy study.
FortisBCRental Apartment Program (RAP)Multi-unit residentialFunded assessment plus equipment incentives for rental buildings.
FortisBCCommercial Energy Assessment Program (CEAP)CommercialFunded assessment identifying gas and electricity measures.
BC HydroBusiness Energy Saving Incentives (BESI)Commercial & industrialPrescriptive incentives for lighting, motors, refrigeration and controls.
BC HydroCustom ProgramIndustrialCapital incentives tied to verified electricity savings.
BC HydroEnergy Performance Report (EPR)Commercial & industrialFunded study establishing electrical baselines and measure economics.
CleanBCCustom-Build / Better BuildingsInstitutional & commercialSupport for fuel-switching and low-carbon new construction.
SEAISupport Scheme for Energy Audits (SSEA)SMEVoucher-funded audits for small and medium enterprises.
SEAIEXEED CertifiedAll non-domesticGrant support for design-stage energy management projects.
SEAISupport Scheme for Renewable Heat (SSRH)Industrial & commercialOperating and installation support for renewable heating systems.
SEAINon-Domestic BERAll non-domesticBuilding Energy Rating assessment and advisory.

Programme terms change annually. This table reflects our current understanding — confirm with us before relying on it.

How a funded project runs

  1. 01

    Screening call

    Twenty minutes to establish building type, fuels, age and likely programmes. No cost.

  2. 02

    Funded assessment

    Where a programme funds the study, we apply on your behalf first — so the analysis costs you little or nothing.

  3. 03

    Study & measure list

    Costed measures with savings, incentive value, payback and carbon impact, sealed under our permit.

  4. 04

    Application

    We prepare and submit the incentive application; you review and approve before it goes.

  5. 05

    Design & construction

    M&E design, tender support and construction review as required.

  6. 06

    M&V and payment

    Post-project verification against the baseline, through to the incentive cheque landing.

Common questions

Do we pay for the assessment?

Often not. Several BC and Irish programmes fund the study itself. We tell you at the screening call which route applies to your building.

How long does an application take?

Screening to submitted application is typically six to ten weeks, dominated by data collection and site access. Programme review adds four to twelve weeks.

Can you work with our existing contractor?

Yes. We are consulting engineers — we do not install. We are happy to work alongside a contractor you already trust.

What if the building does not qualify?

We tell you at the screening stage rather than after you have paid for a study. Where nothing standard fits, we look at custom routes.

Do you work outside BC and Ireland?

Selectively, for existing clients with portfolios that cross borders. Ask.

Find out what your building qualifies for.

Rebate program tracker →