Projects
Work you can check the numbers on.
Figures come from post-retrofit measurement and verification. Some client names are withheld where confidentiality applies.
Healthcare2025
18%Energy reduction
$740kIncentives secured
Education2025
District 36 Schools Portfolio
22%Gas reduction
$1.1MIncentives secured
Commercial2026
Broadway Tech Centre
2.4 MWAssessed load
6Buildings
Multi-unit residential2024
West End MURB Retrofit
32%Energy reduction
$410kIncentives secured
Recreation2024
Fraser Valley Ice Arena
1,240 tCO₂e avoided
18 moSimple payback
Industrial2023
Lower Mainland Distribution Centre
41%Electricity saved
$265kIncentives secured
Healthcare2023
Interior Long-Term Care Facility
27%Gas reduction
RAPProgramme route
Commercial2026
Ireland case study — to be added
—Result
—Result
Industrial2026
Ireland case study — to be added
—Result
—Result
No projects match those filters yet.
How we report a result
Savings are stated against a metered baseline normalised for weather and occupancy, following IPMVP Option B or C depending on the measure. Incentive figures are the amount actually paid, not the amount applied for. Where a figure is an estimate at design stage, we label it.
- Baseline period stated in every report
- Weather normalisation to a 10-year average
- Incentives shown as paid, not applied for
- Design-stage estimates labelled as such