Projects

Work you can check the numbers on.

Figures come from post-retrofit measurement and verification. Some client names are withheld where confidentiality applies.

Region
Sector

Healthcare2025

Coastal Regional Hospital

Vancouver, BC · Energy audit · M&V

18%Energy reduction
$740kIncentives secured
Education2025

District 36 Schools Portfolio

Surrey, BC · Continuous optimization

22%Gas reduction
$1.1MIncentives secured
Commercial2026

Broadway Tech Centre

Burnaby, BC · Electrical planning report

2.4 MWAssessed load
6Buildings
Multi-unit residential2024

West End MURB Retrofit

Vancouver, BC · Heat-pump conversion · 148 suites

32%Energy reduction
$410kIncentives secured
Recreation2024

Fraser Valley Ice Arena

Abbotsford, BC · Refrigeration heat recovery

1,240 tCO₂e avoided
18 moSimple payback
Industrial2023

Lower Mainland Distribution Centre

Delta, BC · Lighting, controls and rooftop heat pumps

41%Electricity saved
$265kIncentives secured
Healthcare2023

Interior Long-Term Care Facility

Kelowna, BC · Boiler plant and ventilation upgrade

27%Gas reduction
RAPProgramme route
Commercial2026

Ireland case study — to be added

Dublin · Project details pending

Result
Result
Industrial2026

Ireland case study — to be added

Cork · Project details pending

Result
Result

How we report a result

Savings are stated against a metered baseline normalised for weather and occupancy, following IPMVP Option B or C depending on the measure. Incentive figures are the amount actually paid, not the amount applied for. Where a figure is an estimate at design stage, we label it.

  • Baseline period stated in every report
  • Weather normalisation to a 10-year average
  • Incentives shown as paid, not applied for
  • Design-stage estimates labelled as such